This report is the feedback information from the NSW Industrial Maintenance Roundtable (IMRt) Common Interest Workgroup (CIWG) meeting on the 18th June 2008.
High Voltage Electrical Maintenance CIWG Report Media:High_Voltage_CIWG_NSW_IMRt_08.pdf
To create a paper version of this report, print the main report and all the appendix and then insert each appendix in the appropriate location at the back of the main report. (Binding for 16mm thick double sided)
Report Appendix
Appendix 1 Sydney Water Introduction Presentation (This is in four parts to keep size below 2 megs)
- Part 1 - Media:HIGH-VOLTAGE-PRESENTATION-BRUCE_1.pdf
- Part 2 - Media:HIGH-VOLTAGE-PRESENTATION-BRUCE-2.pdf
- Part 3 - Media:HIGH-VOLTAGE-PRESENTATION-BRUCE-3.pdf
- Part 4 - Media:HIGH-VOLTAGE-PRESENTATION-BRUCE-4.pdf
Appendix 2 – Portable Instrument for Partial Discharge/ Arc / Corona Detection
This information is in the main report
Appendix 3 - High Voltage Testing Technical Paper by Joe Tusek Media:Risk_Management_through_HV_Testing_Connel_Wagner.pdf
Appendix 4 - Mikron SpyGlass system for Thermal Imaging inspection of electrical cubicles Media:Mikron.pdf
Appendix 5 - Rio Tinto Coal Australia Isolation System Users Handbook Media:20060526_-_Isolation_System_Users_Handbook.pdf
Appendix 6 - Rio Tinto Coal Australia - Isolation Procedure - Live Testing Media:RTCA_Isolation_Procedure_P003_-_Live_Testing.pdf
Appendix 7 - Rio Tinto Coal Australia - Isolation Procedure - Project Isolation (Group Locking) Media:RTCA_Isolation_Procedure_P002_-_Project_Isolation.pdf
Appendix 8 - Sydney Water - Customer Safety Plan (Blank Template in MS Word) - Media:CUSTOMER-SAFETY-PLAN-PROFORMA.doc
Appendix 9 - Sydney Water - Customer Safety Plan - Integral Energy Version - Media:CUSTOMER-SAFETY-PLAN-INTEGRAL.pdf
Appendix 10 - Sydney Water - Customer Safety Plan - Energy Australia Version - Media:CUSTOMER-SAFETY-PLAN-ENERGY_AUST.pdf
Appendix 11 - Sydney Water High Voltage Operating Procedures - Maroon Book - Media:HVOP-FOURTH-EDITION-MAROON-BOOK.pdf
Other Useful Information From Discussions
A Technical Paper recommended by Peter New from Snowy Hydro on by Trevor Lord on Electrical Cable Management. Identification of the Major Issues Determining Cable Life and Reliability
The download site for other technical papers on Cable Management by Trevor Lord. Technical Papers by Trevor Lord on MV Cable Management
The lightning arrestor monitoring system used by BOC on their 132kV switchyard are ABB Excount II.
The Partial Discharge monitoring system BOC are using on our 11kV machines up to 15.8MW is Eaton Cutler Hammer's Insulgard system.
Tomago Aluminium are using an ABB optical fibre arc detection system. A link to the ABB web site for their REA fibre optic light protection system.